A Physical Topology for Optimizing Partition Tolerance in Consortium
Blockchains to Reach CAP Guarantee Bound
- Han Wang,
- Hui Li,
- Qiongwei Ye,
- Ping Lu,
- Yong Yang,
- Peter Han Joo Chong,
- Xiaoli Chu,
- Qi Lv,
- Abla Smahi
Hui Li
Peking University Shenzhen Graduate School
Corresponding Author:lih64@pkusz.edu.cn
Author ProfileXiaoli Chu
The University of Sheffield Department of Electronic and Electrical Engineering
Author ProfileAbstract
Decentralized cryptocurrency systems, known as blockchains, have shown
promise as an infrastructure for mutually distrustful parties to
securely agree on transactions. Nevertheless, blockchain systems are
constrained by the CAP Trilemma. Due to performance degradation, it is
impossible to address this issue by improving simply the consensus layer
or the network layer. To alleviate the CAP constraint in consortium
blockchains, we propose a topological construction method to optimize
the physical layer based on multi-dimensional hypercubes with excellent
partition tolerance in probability. The basic topology has the advantage
of solving the mismatch problem between the overlay network and the
underlying network. It is further extended to hierarchical recursive
topologies with more intermediate links or short links to balance the
reliability requirement with the cost of building the physical network.
We prove that the proposed hypercube topology has better partition
tolerance than the regular rooted tree and ring lattice topologies, and
effectively fits the upper-layer protocols at the consensus and network
layers. As a result, combined with suitable transmission and consensus
protocols that satisfy strong consistency and availability, the proposed
topology-constructed blockchain can reach the CAP guarantee bound.13 Feb 2023Submitted to Transactions on Emerging Telecommunications Technologies 13 Feb 2023Submission Checks Completed
13 Feb 2023Assigned to Editor
13 Feb 2023Review(s) Completed, Editorial Evaluation Pending
10 Mar 2023Reviewer(s) Assigned
13 Mar 2023Editorial Decision: Revise Major
25 Apr 20231st Revision Received
25 Apr 2023Review(s) Completed, Editorial Evaluation Pending
25 Apr 2023Submission Checks Completed
25 Apr 2023Assigned to Editor
25 Apr 2023Reviewer(s) Assigned
09 Jun 2023Editorial Decision: Accept