Essential Site Maintenance: Authorea-powered sites will be updated circa 15:00-17:00 Eastern on Tuesday 5 November.
There should be no interruption to normal services, but please contact us at help@authorea.com in case you face any issues.

loading page

A 4th-order sturdy MASH 2-0 noise shaping SAR ADC with an enhanced residue gain-error-shaping technique
  • Lizhen Zhang,
  • Jianhui Wu
Lizhen Zhang
Southeast University
Author Profile
Jianhui Wu
Southeast University

Corresponding Author:wjh@seu.edu.cn

Author Profile

Abstract

The multi-stage noise shaping (MASH) ΣΔ ADC has a good potential to achieve high-order noise shaping (NS) and high resolution. However, it suffers from the quantization noise leakage issue caused by the mismatch between the analog NS loop filter and the digital cancellation filter, which greatly degrades the ADC performance. The sturdy MASH structure can solve the noise leakage issue, but it cannot be directly used for NS SAR ADCs due to the structural limitations. In this paper, we propose a sturdy MASH 2-0 NS SAR to solve the noise leakage issue. The 4th-order NS is achieved by only using a 2-0 topology, which is hardware efficient. Instead of eliminating the first-stage quantization error, the proposed sturdy MASH 2-0 NS SAR shapes the quantization error, achieving better robustness to PVT variables. Furthermore, owing to the enhanced residue gain-error-shaping (GES) technique and the first-stage 2nd-order NS capability, the impairments of the residue amplifier, including the gain error, noise, and settling inaccuracy, are 4th-order shaped. Our proposed NS SAR ADC with the enhanced GES technique is implemented in a 28 nm CMOS process, which achieves a SNDR of 84.8 dB and a SFDR of 99.2 dB.
Submitted to Electronics Letters
16 Jun 2024Reviewer(s) Assigned
25 Jun 2024Review(s) Completed, Editorial Evaluation Pending
07 Jul 20241st Revision Received
08 Jul 2024Submission Checks Completed
08 Jul 2024Assigned to Editor
08 Jul 2024Review(s) Completed, Editorial Evaluation Pending
08 Jul 2024Reviewer(s) Assigned
29 Jul 2024Editorial Decision: Revise Minor
30 Jul 20242nd Revision Received
01 Aug 2024Submission Checks Completed
01 Aug 2024Assigned to Editor
01 Aug 2024Review(s) Completed, Editorial Evaluation Pending
01 Aug 2024Reviewer(s) Assigned
12 Aug 2024Editorial Decision: Accept