Influence of Parameter Changes on The Operation Characteristics of Circuit Breaker with Oil Dashpot at Low Temperature
  • +1
  • Xiuping SU,
  • Yanqing JIA,
  • Hongwei SHI,
  • Zhe FU
Xiuping SU
HEBUT

Corresponding Author:suxiuping@hebut.edu.cn

Author Profile
Yanqing JIA
HEBUT
Author Profile
Hongwei SHI
Zhejiang BSB Electrical Appliance Co., Ltd
Author Profile
Zhe FU
HEBUT
Author Profile

Abstract

The iron core in the circuit breaker of oil dashpot is mainly affected by the electromagnetic force, spring force and oil damping force, which can play the function of anti-time protection when overload current is excited. At low temperature, the viscosity of the methyl silicone oil damping fluid will change, and the parameters of spring and iron core will also change with temperature. The change of this parameters will lead to the change of the resultant force on the iron core, which will affect the operation time. To analyze this problem, a correlation model is established. Through the measurement of parameters at low temperature, numerical calculation, electromagnetic analysis, simulation analysis and compared with the experimental results. The study found that the viscosity of the damping fluid increases, the iron core is deformed, and the spring stiffness increases at low temperature. The influence of a single factor on the operation characteristics of the tripper is not enough to reflect its overall characteristics, and the comprehensive effect of each factor needs to be considered. After comprehensively considering all factors, the results are closer to the experimental results. The results provide a theoretical basis for the optimization design of the circuit breaker.
12 Oct 2022Submission Checks Completed
12 Oct 2022Assigned to Editor
16 Oct 2022Reviewer(s) Assigned
24 Nov 2022Review(s) Completed, Editorial Evaluation Pending
28 Nov 2022Editorial Decision: Revise Major
24 Dec 20221st Revision Received
09 Jan 2023Submission Checks Completed
09 Jan 2023Assigned to Editor
11 Jan 2023Reviewer(s) Assigned
30 Jan 2023Review(s) Completed, Editorial Evaluation Pending
03 Feb 2023Editorial Decision: Accept