A Study on the Evaluation Method for the Operating Status of Overhead Transmission Lines Based on Analytic Hierarchy Process (AHP)
  • +4
  • Qingbin Wang,
  • Liang Wang,
  • Ri Tian,
  • Shuangpeng Cao,
  • Shuai Zuo,
  • Di Che,
  • Lantao Jing
Qingbin Wang
Shenyang Institute of Engineering
Author Profile
Liang Wang
Shenyang Institute of Engineering

Corresponding Author:2253755887@qq.com

Author Profile
Ri Tian
State Grid Liaoning Electric Power Supply Co Ltd
Author Profile
Shuangpeng Cao
State Grid Liaoning Electric Power Supply Co Ltd
Author Profile
Shuai Zuo
Shenyang Institute of Engineering
Author Profile
Di Che
Shenyang Institute of Engineering
Author Profile
Lantao Jing
Shenyang Institute of Engineering
Author Profile

Abstract

To address the difficulty of dynamically assessing overhead transmission lines under varying meteorological conditions through manual inspections and drone monitoring, this study proposes an evaluation method for the operating status of overhead transmission lines based on the Analytic Hierarchy Process (AHP). A mathematical model based on AHP is first established to perform weighted processing of five meteorological factors, generating a comprehensive meteorological dataset. A simulation model for the LGJ-300/70 type conductor is then developed under the temperature field, where temperature distribution during operation is determined based on different meteorological data. Stress variations are observed, and evaluation criteria are established by calculating displacement deviations in the two-dimensional transmission line model. The transmission line is considered to be in a normal operating state when the maximum displacement deviation is ≤ ±0.63 mm. This demonstrates that the AHP-based evaluation method can effectively enable dynamic assessment of the operating status of overhead transmission lines.
29 Oct 2024Submitted to Engineering Reports
29 Oct 2024Submission Checks Completed
29 Oct 2024Assigned to Editor
29 Oct 2024Review(s) Completed, Editorial Evaluation Pending
05 Nov 2024Reviewer(s) Assigned
02 Dec 2024Editorial Decision: Revise Minor
13 Dec 20241st Revision Received
14 Dec 2024Submission Checks Completed
14 Dec 2024Assigned to Editor
14 Dec 2024Review(s) Completed, Editorial Evaluation Pending
14 Dec 2024Reviewer(s) Assigned
22 Dec 2024Editorial Decision: Accept