loading page

Hybrid modeling for in situ artificial fish spawning ground stabilization
  • +5
  • Kim-Jehanne Lupinski,
  • Guillaume Brousse,
  • Raphaël Maurin,
  • Pierre Sagnes,
  • Dominique Courret,
  • Florian Cordier,
  • Laurent Lacaze,
  • Magali Jodeau
Kim-Jehanne Lupinski
Laboratoire National d'Hydraulique et Environnement

Corresponding Author:kim-jehanne.lupinski@edf.fr

Author Profile
Guillaume Brousse
Laboratoire National d'Hydraulique et Environnement
Author Profile
Raphaël Maurin
Institut de Mecanique des Fluides de Toulouse
Author Profile
Pierre Sagnes
Pôle R&D 'Ecohydraulique’ OFB-IMFT-PPRIME
Author Profile
Dominique Courret
Pôle R&D 'Ecohydraulique’ OFB-IMFT-PPRIME
Author Profile
Florian Cordier
Laboratoire National d'Hydraulique et Environnement
Author Profile
Laurent Lacaze
Institut de Mecanique des Fluides de Toulouse
Author Profile
Magali Jodeau
Laboratoire National d'Hydraulique et Environnement
Author Profile

Abstract

Erosion generally reduces the resilience of replenished gravel in rivers. This is why structures are sometimes added to modify the upstream flow and stabilize artificial spawning grounds. In particular, rows of boulders can be placed around the replenishment area to limit the transport of replenished gravel during flood events. This study aims to optimize the arrangement of these rows, based on field experiments as well as physical and numerical models. A combined hydro-sedimentary numerical model is calibrated and validated by comparing simulated and measured morphological evolutions in nine laboratory experiments. The results show that boulders downstream of the replenishment slow down the flow above the replenishment, decreasing shear stress on the gravel. Stabilization efficiency is shown to depend on the positioning of the boulders and arrangement of the replenishment surface. In order to achieve sustainable spawning, prospective scenarios with the numerical model highlight the need to limit the width of the replenishment area.
25 Jan 2024Review(s) Completed, Editorial Evaluation Pending
25 Jan 2024Reviewer(s) Assigned
25 Jul 20241st Revision Received
25 Jul 2024Assigned to Editor
25 Jul 2024Submission Checks Completed
25 Jul 2024Review(s) Completed, Editorial Evaluation Pending
29 Jul 2024Reviewer(s) Assigned