loading page

Coordinated Planning Method Considering Flexible Resources of Active Distribution Network and Soft Open Point Integrated with Energy Storage System
  • +1
  • Zitong Huang,
  • Yonghai Xu,
  • Lin Chen,
  • Xingjie Ye
Zitong Huang
North China Electric Power University State Key Laboratory of Alternate Electrical Power System with Renewable Energy Sources
Author Profile
Yonghai Xu
North China Electric Power University

Corresponding Author:yonghaixu@263.net

Author Profile
Lin Chen
North China Electric Power University
Author Profile
Xingjie Ye
North China Electric Power University State Key Laboratory of Alternate Electrical Power System with Renewable Energy Sources
Author Profile

Abstract

Faced with the uncertainty of wind and photovoltaic power output and load fluctuation caused by the increase of new energy penetration in active distribution network, the demand for operational flexibility and the construction demand for flexible resources of distribution network are gradually increasing. The flexible operation of active distribution network can be realized by coordinated planning of the soft open point integrated with energy storage system (ESOP) and flexible resources. Firstly, the flexibility resource adjustability evaluation and margin indicators are proposed for the response model of typical flexibility resources. Secondly, a two-stage distributionally robust coordinated planning model considering the coordination planning scheme of distributed generation, flexibility resource and ESOP as well as the comprehensive norm uncertainty of wind power and photovoltaic outputs multi-operation scenarios is established with the distribution network construction cost, annual operation cost and annual power sales revenue as the objective functions meanwhile the investment and flexibility resource operation as constraints. Finally, the column constraint generation algorithm is used to solve the problem, and the effectiveness of the proposed model is verified by the modified IEEE33 node system.
14 Jul 2023Submitted to IET Generation, Transmission & Distribution
18 Jul 2023Submission Checks Completed
18 Jul 2023Assigned to Editor
30 Jul 2023Reviewer(s) Assigned
15 Aug 2023Review(s) Completed, Editorial Evaluation Pending
01 Sep 2023Editorial Decision: Revise Major
26 Sep 20231st Revision Received
28 Sep 2023Submission Checks Completed
28 Sep 2023Assigned to Editor
28 Sep 2023Review(s) Completed, Editorial Evaluation Pending
28 Sep 2023Reviewer(s) Assigned