Development of wire length measuring equipment for prefabricated erection of transmission lines
  • +2
  • xiaobin li,
  • Baojun LIU,
  • Pan YAO,
  • Hongbing WEN,
  • Riping ZHENG
xiaobin li
Jiangmen Power Supply Bureau of Guangdong Power Grid Co. Ltd

Corresponding Author:jmlixiaobin@163.com

Author Profile
Baojun LIU
Jiangmen Power Supply Bureau of Guangdong Power Grid Co. Ltd
Author Profile
Pan YAO
Jiangmen Power Supply Bureau of Guangdong Power Grid Co. Ltd
Author Profile
Hongbing WEN
Jiangmen Power Supply Bureau of Guangdong Power Grid Co. Ltd
Author Profile
Riping ZHENG
Jiangmen Power Supply Bureau of Guangdong Power Grid Co. Ltd
Author Profile

Abstract

The existing prefabricated wireline construction technology is difficult to accurately measure the real-time length of the deployed wires, resulting in too large construction errors and cannot be popularized and applied. To this end, a length measuring device that can accurately measure the length of the wire during the construction of the prefabricated wire is developed. In terms of the hardware of the length measuring equipment, based on the construction characteristics of the prefabricated wiring and the characteristics of the wire, the photoelectric encoder and the STC8G series single chip microcomputer are used to complete the collection and processing of the wire length data, and the mature and stable LoRa technology is used to complete the wireless transmission of the data. In terms of software program of length measurement equipment, the measurement of wire length data, transmission and interaction of control command signals are realized by optimizing length measurement scheme, interface development of terminal equipment and information interaction program design. Finally, according to the actual working conditions of the prefabricated wiring construction, the mechanical structure of the length measuring equipment is designed, and the assembly is completed. The developed length measuring equipment has been successfully applied to practical projects. According to the wire length measuring equipment, the deviation between the observation sag and the design sag after the wire length is measured by the wire length measuring equipment is 2.0%, which meets the design requirement of ±2.5%.
27 Sep 2022Submitted to The Journal of Engineering
27 Sep 2022Submission Checks Completed
27 Sep 2022Assigned to Editor
04 Oct 2022Reviewer(s) Assigned
18 Oct 2022Review(s) Completed, Editorial Evaluation Pending
19 Oct 2022Editorial Decision: Revise Major
12 Nov 20221st Revision Received
13 Nov 2022Submission Checks Completed
13 Nov 2022Assigned to Editor
13 Nov 2022Reviewer(s) Assigned
01 Dec 2022Review(s) Completed, Editorial Evaluation Pending
03 Dec 2022Editorial Decision: Revise Major
24 Dec 20222nd Revision Received
26 Dec 2022Submission Checks Completed
26 Dec 2022Assigned to Editor
26 Dec 2022Reviewer(s) Assigned
04 Jan 2023Review(s) Completed, Editorial Evaluation Pending
04 Jan 2023Editorial Decision: Revise Major
21 Jan 20233rd Revision Received
27 Jan 2023Submission Checks Completed
27 Jan 2023Assigned to Editor
28 Jan 2023Reviewer(s) Assigned
13 Feb 2023Review(s) Completed, Editorial Evaluation Pending
13 Feb 2023Editorial Decision: Accept